Blog

Featured Editorial: Top considerations for emergency equipment specification, installation

BICBusiness and Industry Connection’s (BIC) August issue features an editorial by Casey Hayes, Director of Sales and Operations for Haws Integrated™, where he discusses the five factors to consider for emergency specification, installation.

Recommendations include details on:

  1. Equipment location
  2. Assuring visibility
  3. Product suitability
  4. Tempered water requirement
  5. Assuring proper maintenance

To read more from the Haws Integrated™ White Paper feature, you can visit BIC Magazine (page 73). Also, visit Haws Integrated™ for a full range of ANSI-compliant solutions!  haws integrated

And if you’re attending the National VPPPA Conference, come visit us at booth number 1010!

We want to hear from you!

Complete our customer experience survey for a chance to win a $250 Amazon gift card, drawings held quarterly.

Enter to Win!